Raypak Temp-Tracker Instruções de Operação Página 19

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 18
19
CONTROLLER
SETTINGS
T
ables F through T describe the “View” and “Adjust”
menus. They also show the default settings as well
as any possible adjustment ranges.
1
20V
Fig. 25: Wiring Diagram (Field Installation)
Field Installation
Field wiring must be connected to the terminal block
o
n the back side of the controller mounting bracket.
Follow the wiring diagram as specified in Fig. 25
below.
Vista de página 18
1 2 ... 14 15 16 17 18 19 20 21 22 23 24 ... 35 36

Comentários a estes Manuais

Sem comentários